# PhysaFlow — How the estimate works

The capacity assessment is a deterministic scenario model. The same inputs produce the same result. Its coefficients are model assumptions; they are not presented as validated industry benchmarks or measured PhysaFlow deployment outcomes.

## Capacity model

Usable IT capacity is the minimum of all available valid grid, commissioned electrical and cooling IT constraints. Grid IT capacity is gross deliverable power minus intentional reliability headroom, divided by reporting-period PUE. Missing constraints are excluded and disclosed. Invalid supplied inputs must be corrected.

Utilization is measured average IT load divided by usable IT capacity. Loads above usable capacity are invalid. Unused capacity is not automatically stranded. The modeled rate is unused rate multiplied by a cooling scenario coefficient: air 0.485, liquid/immersion 0.340, hybrid 0.4125. Tier and visibility adjustments are zero. The result is bounded between zero and unused capacity. Unknown cooling permits raw capacity results only.

## Economic assumptions

Annual revenue opportunity uses site-specific revenue assumptions or eligible hosting/colocation sensitivity cases of $1.2M, $1.6M, or $2.355M per IT MW-year. This is a revenue proxy, not universal financial loss. Ranges remain ranges. Recoverable capacity and revenue require a supplied site-specific recoverable share; there is no default recovery percentage.

## GPU equivalent and reporting period

GPU equivalents use reported installed inventory, matching GPU IT capacity, hardware model, and actual reporting hours. Stranded capacity is allocated proportionally to the GPU share of usable capacity. Owner cost is supplied separately. Revenue and GPU owner cost are alternative valuations and are never added together. Dates define a UTC interval with the start included and end excluded; leap years and partial periods use their actual hours.

## The homepage scenario

The illustrative colocation preview treats the selected capacity as usable IT capacity, with no additional grid or cooling constraint. Facility capacity is adjustable; utilization is fixed at an illustrative 60% with air cooling. At 80 MW usable capacity, 60% utilization, and air cooling, modeled stranded capacity is 15.52 MW and annual revenue opportunity is $24.832M at the $1.6M/IT MW-year reference assumption. The illustrative reporting period is January 1, 2025 to January 1, 2026. These are scenario assumptions, not customer measurements. The full calculator evaluates individual capacity constraints from site inputs.

## Limits and next steps

The model does not simulate thermal transients, redundancy, network dependencies, workload eligibility, or site-specific control limits. Use it to scope further measurement. Engineering review and operating data are needed to establish usable capacity and approve any changes.

[Assess Your Capacity](https://physaflow.com/calculator)

## Agent resources

- [PhysaFlow agent instructions](https://physaflow.com/llms.txt)
- [Developer documentation](https://physaflow.com/developers.md)